1. CLECC-Wartsila Finland-BCPP/San Miguel Corp – BESS Project
40MW & 20MW – Limay, Bataan & Toledo Cebu; Erection, Cabling, Testing and Commissioning of 50MVA 69/13.8kV Air Insulated Substation.
2. Schneider Electric Philippines-Meralco Hybrid Substation – Grace Park
10 Ave. Grace Park, Caloocan City, Installation of Medium Voltage 34.5kV 9 Cubicles-Gas Insulated Switchgear, Testing and Commissioning
3. Trends/Semirara-Calaca Power Corporation – PACU Unit 1&2
Bgy San Rafael, Calaca, Batangas, Installation of Low Voltage Main Distribution Panel and Secondary Distribution Panel/ATS (6) Assemblies for Package Air Condition Unit for Power Plant 1&2.
4. ABB Philippines – JG Summit Petrochemical Corporation
Bgy Simlong, Batangas City, Supply of MVSG Platform Skid for 20 Bay SwitchGear.
5. Concepcion Durables Inc – Electrical Power System Study and Upgrade
Laguna Industrial Science Park 1, Asbuilting of power installation and study of electrical power system.
6. V&A Law Center Building – Installation of LVSG ATS and Maintenance
BGC Taguig, Installation of ATS Protection and operation.