ONGOING PROJECTS

1. SE-Meralco-Hybrid Substation Sta.Rosa Laguna

Design, fabrication and delivery of hot-dip galvanized tubular steel frame, including additional supports. Mobilization of Lifting Crane or Fork lift (5 tonner) and tools for the stripping/hauling/unloading of equipment: Hybrid GIS and Station Service Transformer. Installation, testing and commissioning of 34.5kV GIS, station service transformer & power fuse assembly.

 

 

2. SE-Meralco-Hybrid Substation Cainta Rizal

Design, fabrication and delivery of hot-dip galvanized tubular steel frame, including additional supports. Mobilization of Lifting Crane or Fork lift (5 tonner) and tools for the stripping/hauling/unloading of equipment: Hybrid GIS and Station Service Transformer. Installation, testing and commissioning of 34.5kV GIS, station service transformer & power fuse assembly.